I, like many of you may have received this email. I wanted to make sure everyone saw it. Thanks to everyone who helps maintain our trails!
We are emailing you because you are an important member of the trail using community. As you may have heard in our previous emails we are going to be starting up a trail work crew. We have set November 15th as the date to do our first trail project. This project will be in cooperation/preparation for the 9 Trails Race whose organizers have informed us what they need. No experience in trail maintenance is required and no tools are required, both will be provided to you. Some more specifics about this event:
Date: Sat, November 15th
Approximate time commitment: 3-4 hours (probably 9am - noonish)
Location: Rattlesnake Trail. Tunnel- Rattlesnake Connector, meet @ Rattlesnake Trail Head shuttle to top of trail?
Attire: Sturdy shoes, pants, long sleeve shirt, gloves, and glasses - sun or other. Helmets are required, bicycle will work fine, we will provide you if needed.
Supplies: It is recommended that you wear sunscreen/lip balm. Bring at least a liter+ of water and a snack and have a small backpack/camelbak if possible.
Project Specifics: De-Brush and repair tread of the Tunnel-RS Connector Trail. Use of mcleods, loppers, and hand saws will accomplish this. This section of trail is approximately 1 mile in length, 4-5 miles of hiking total are expected.
Following the work we will hike back down to our cars at the trail head and call it a day. Everyone who participates will receive a T-shirt so let us know you size. Person to contact about this event is Dave Everett, (805) 729-0028, feel free to contact him for more information.
Thank you,
The Multiuse Trails Coalition,
http://www.multiusetc.org/
Subscribe to:
Post Comments (Atom)
1 comment:
Thanks for posting this Greg! We apprectiate your support.
Post a Comment